We've distilled the solar journey into a clear, predictable process, so you always know what comes next.

Step by Step

Four phases to clean power

01

Site Assessment

Advanced satellite imagery and shade analysis evaluate your roof's solar potential before a single panel is placed.

02

Custom System Design

Engineers model your energy profile and design a system optimized for production, aesthetics, and local codes.

03

Permitting & Install

We handle permits, inspections, and professional installation, typically completed in one to two days.

04

Activation & Monitoring

Once interconnected, your system goes live with real-time monitoring and automated performance alerts.

What we analyze

  • Roof orientation, pitch, and available area
  • Shading from trees, chimneys, and neighboring structures
  • Historical energy consumption patterns
  • Local grid regulations and net metering policies
  • Structural integrity and load-bearing capacity

What you can expect

  • Detailed system proposal with production estimates
  • Clear system proposal with production estimates
  • Full permit and interconnection handling
  • Professional installation in 1–2 days
  • Post-install monitoring and support

Timeline

Most homes are live within 4–8 weeks

Permitting timelines vary by municipality, but our team manages every step to keep your project on track.