Your path to energy independence
We've distilled the solar journey into a clear, predictable process, so you always know what comes next.
Step by Step
Four phases to clean power
01
Site Assessment
Advanced satellite imagery and shade analysis evaluate your roof's solar potential before a single panel is placed.
02
Custom System Design
Engineers model your energy profile and design a system optimized for production, aesthetics, and local codes.
03
Permitting & Install
We handle permits, inspections, and professional installation, typically completed in one to two days.
04
Activation & Monitoring
Once interconnected, your system goes live with real-time monitoring and automated performance alerts.
What we analyze
- Roof orientation, pitch, and available area
- Shading from trees, chimneys, and neighboring structures
- Historical energy consumption patterns
- Local grid regulations and net metering policies
- Structural integrity and load-bearing capacity
What you can expect
- Detailed system proposal with production estimates
- Clear system proposal with production estimates
- Full permit and interconnection handling
- Professional installation in 1–2 days
- Post-install monitoring and support
Timeline
Most homes are live within 4–8 weeks
Permitting timelines vary by municipality, but our team manages every step to keep your project on track.